top of page
Project in Tanzania
The daily processing capacity is 2,000 tons of ore and the annual processing capacity is 600,000 tons.
Annual production of 46,000 tonnes of graphite concentrate with a high grade of over 95%, premium flake concentrate above +100 is over 70%.
bottom of page